Client wanted their swimming pool filled in, yet keep the jacuzzi, below.
.
Pebble Tec & new tiles were added to the jacuzzi, and a lower waterfall basin, with new stone coping to match the existing on the jacuzzi.
A Conservatory will replace the swing, above, with the next layer of their garden plan.
We built the arbor during this phase, see previous post.
